First Data
A five-week LED lighting upgrade of a multi-storey office and car park in Basildon, including 1,800 LED panels.
- Commercial lighting upgrade
- Basildon, Essex
- 5-week programme
Planning & Preparation
Our design team met the client on site to agree planning, risk assessments, programme, site compound and fitting samples. Every member of our team was police-checked and signed off by the client before work began.
Read moreShow less
To keep staff safe and the office running, we worked night shifts when no employees were at their desks.

How we prepared
- Site meetings on planning and programme
- Risk assessments and method statements
- Police-checked, client-approved team
- Night-shift working to avoid disruption
- Site compound set up before delivery
Installation & Quality
Each night, 90 light fittings were installed and tested, then signed off by the client’s maintenance engineer against a quality checklist. Our on-site supervisor managed quality and teams area by area.
Read moreShow less
Client-requested changes, such as separately switched lighting and a room split for a new office, were recorded on job sheets and approved immediately, so progress was never held up.

Installation
- 1,800 600×600 LED panels installed
- 90 fittings installed and tested each night
- Nightly sign-off by the maintenance engineer
- Supervisor-led quality control
- Variations approved without delay
External Car Park Lighting
Our lighting design team designed new car park lighting to BS EN 12464 and BS 5489:2013, based on a risk assessment of vehicle, pedestrian and crime factors.
Read moreShow less
We replaced over 60 400W metal halide fittings with 150W LED fittings, directing light where it is needed and reducing obtrusive light and glare for drivers.

Car park lighting
- Designed to BS EN 12464 and BS 5489:2013
- 60+ 400W metal halide fittings replaced with 150W LED
- Directional optics to reduce obtrusive light
- Old fittings separated and recycled
- Full handover with documentation and warranties
Ready when you are
Let’s talk about your project
Share the construction programme and a floor plan — we’ll come back with a load schedule, a connection strategy and a clear price. Working across Ireland, the UK and mainland Europe.
- 01Send your programme
- 02Load schedule & connection strategy
- 03Clear price